INTERNATIONAL CLIENT

AL TANMIYA COMPANY

Location

Plant Capacity

–  Iraq

–  105 MW

Scope of Work

Entire Operation and Maintenance of  2 × 34 MW gas Turbine based Power Plant ,CCPP, GE Frame-6.

DOMESTIC THERMAL

S.No

CLIENT

LOCATION

PLANT CAPACITY

SCOPE OF WORK

1

JINDAL INDIA

 Orissa

600 MW

Installation , erection & commissioning of 600 MW Turbine generator.

2

TENUGHAT VIDYUT NIGAM LIMITED

Jharkhand

210 MW

Operations & Maintenance of 210 MW Tenughat Thermal Power station.

3

VANDANA VIDYUT LIMITED

Chhattisgarh

135 MW

Operations & Maintenance of 135 MW Power Plant.

4

ABHINAV STEEL PRIVATE LIMITED

Uttar Pradesh

60 MW

Fabrication, Erection and Commissioning of 240 TPH CFBC Boiler, 60 MW Turbine- Generator with other related Turbine building structural work. With proper unloading and checking of related material for Coal fired Captive Power Plant.

5

ELECTRO STEEL

Bokaro

60 MW

2x 60 MW Turbine Generators erection &  BOP .

6

DALMIA BHARAT LTD. (ODISHA CEMENT LTD.)

Odisha

54 MW

2 X27 MW (CFBC, AFBC & WHRS)

7

NAVBHARAT FERRO ALLOYS LTD

 

55 MW

Overhaul & Renovation  of 55 MW Turbine Generator at power plant.

8

BRAHMAPUTRA CRACKERS & POLYMERS LTD

Assam

53 MW

1.)Operations & Maintenance of 22.5 x2 (gas turbine) + 1×8(Steam turbine)MW Power Plant.

2)BCPL-supply of DCS Engg. And BOE

3)BCPL-Mechanical & Maintenance of LLDPE,PPU,PTD,CPP,IOUS, OFU

9

TIRMULA INDUSTRIES LIMITED

Madhya Pradesh

38 MW

Erection, testing and commissioning of  26 + 12 MW Power plant .

10

ADHUNIK CEMENT

Jamshedpur

30 MW

Operation & Maintenance of 30 MW

11

IMPEX PVT. LTD.

Dhanbad

30 MW

Operations & Maintenance of 30 MW CPP.

12

MAITHAN ISPAT LTD

 Orissa

30 MW

Entire operation and maintenance of the 30 MW Power Plant along with Fuel &   Water management .

13

ABHIJEET GROUP

West Bengal

25 MW

Corporate Ispat Durgapur 25 MW having  CFBC  BOILERs.

14

ADHUNIK CEMENT

Meghalaya

25 MW

Operations & Maintenance of 25 MW CPP.

15

ANKIT METAL & POWER LIMITED

West Bengal

25 MW

Operations & Maintenance of 25 MW Power Plant.

16

CONCAST STEEL

West Bengal

25 MW

Operations & Maintenance of 25 MW Power Plant.

17

ANKIT METAL & POWER LIMITED

West Bengal

20 MW

Operations & Maintenance of 12 + 8 MW Power Plant.

18

HIMADRI CHEMICALS

Singur

20 MW

Operation And Maintenance of 20 MW Power Plant(1 x 12 + 1x 8 )

19

USHA MARTIN LIMITED

Jharkhand

20 MW

 Entire operation and maintenance of the 2X10 MW Coal Based Power Plant along with Fuel & Water management .

20

KOHINOOR STEEL 

 Jamshedpur

17 MW

17 MW CPP Operated for the   Last 5 yrs with Record Generation and Optimization of Fuel for Cost Savings .

21

SHRI SHYAM ISPAT (INDIA) PVT. LTD.

Chattisgarh

17 MW

Operation And Maintenance for 17 MW Captive Power Plant.

22

HARYANA CO-OPERATIVE SUGAR MILLS LTD.

Haryana

16 MW

Operation And Maintenance of 16 MW Power Turbine

23

ROHTAK CO-OPERATIVE SUGAR MILLS LIMITED

Haryana

16 MW

Operation & Maintenance contract for 16 MW steam turbine .

24

GEMCO ENERGY LIMITED

Haryana

15 MW

Design, Engineering, Dismantling, Fabrication, Erection & Commissioning of 1 X 15 MW Turbo-Generator and 2 X 35 TPH Travelling grate Boilers and its auxiliaries.

25

MAITHAN ALLOYS LTD

Guwahati

15 MW

Entire operation and maintenance of the 15 MW Power Plant along with Fuel & Water management.  

26

SHAH SPONGE

jamshedpur

15 MW

FROM ERECTION STAGE 15 MW CPP

27

VISION SPONGE & IRON LTD

West Bengal

15 MW

Entire Operation & Maintenance of 15 MW Power Plant.

28

SRI MAHAVIR FERRO

Rourkela

12.6 MW

Operations & Maintenance of 12.6 MW Power Plant

29

BHASKAR STEEL & FERRO ALLOY LTD

Orissa

12 MW

Operation And Maintenance of 12 MW CPP (Electrical, Mechanical & Instrumental)

30

MCSPL ( Maa Chinnamastika Steels & Power Ltd.)

West Bengal

12 MW

Entire operation and     maintenance of the 12 MW Power Plant along with Fuel & Water management .

31

SEVEN STARS STEELS LTD.

Orissa

12 MW

Operation And Maintenance of 12 MW Captive Power Plant.

32

TRIMULA INDUSTRIES LTD.

Madhya Pradesh

12 MW

Operation And Maintenance of 12 MW CPP Power Plant along with 38 TPH waste Heat recovery Boiler Power Plant Originating from hot guessel Bow Duct to Conveying of Ash to Ash -Silo and Power at the Terminal of 33 KV Substation.

33

AML STEEL & POWER

Jamshedpur

10 MW

Commissioning of 10 MW Power plant.

34

AMRIT BIO

West Bengal

10 MW

Commissioning of 10 MW Independent Power plant.

35

BHARAT COOKING COAL LIMITED

Jharkhand

10 MW

Repair, Renovation, Overhauling and re-erection of 2 X 10 MW  Captive Power Plant

36

DEEPAK STEEL & POWER LTD

Orissa

10 MW

 Entire operation and maintenance of the 10 MW Power Plant along with Fuel & Water management .

37

SHREE JAGANNATH METALLIC INDUSTRIES LTD.

Orissa

10 MW

Operation And Maintenance of 10 MW Power plant

38

YAZDANI STEEL & POWER LTD

Orissa

10 MW

Entire operation and maintenance of the 10 MW Power Plant with AFBC boiler along with Fuel &Water management .

39

AMRIT ENVIRONMENTAL (P) LTD.

Rajasthan

8 MW

Entire operation and maintenance of the 8 MW Power Plant along with Fuel & Water management  .

40

ENNORE COKE

Assam

8 MW

Operations & Maintenance of 8 MW Power Plant.

41

VIDARBHA SUGAR MILLS PVT LTD

Maharashtra

5 MW

O & M contract ,supplied 5 MW condensing Turbine & modified this condensing Turbine in to Controlled Extraction

42

KIC METALLICS

West Bengal

4.7 MW

Operation And Maintenance of 1 × 4.7 MW Captive Power plant  along with Fuel & Water management .

43

CMJ BEWERIES PVT. LTD.

Meghalaya

4.2 MW

Operation And Maintenace of 4.2 MW CPP

44

RUCHI SOYA

Maharashtra

4.2 MW

Operation And Maintenance of 1 × 4.42 MW BTG Operations in CPP.

45

GWALLIOR DISTILLERS

Madhya Pradesh

3.5 MW

Entire operation and maintenance of the 3.5 MW Power Plant along with Fuel & Water management for last one year.

46

EVIKA GREEN ENERGY (I) PVT LIMITED

West Bengal

2.5 MW

For 2 X 2.5 MW Biomass based Power Plant ,Erection, Testing, Commissioning, demonstrating, the performance guarantee test in conformity with the technical specification of the EPC package including the provision of specialist as required for supervision of erection, testing , commissioning of the EPC package.

47

INDRA SUGARS PVT LTD.

Nepal

2.5 MW

Supplied 2.5 MW Back Pressure Steam Turbine & Commissioned it.

48

ABHIJEET GROUP

West Bengal

 

110TPH CFBC Chinese Boiler overhauling at Corporate
 Ispat Plant .

49

ADHUNIK CEMENT

Meghalaya

 

Erection of 56 X 2 TPH FBC IJT Boiler & ESP .

50

ANKIT METAL & POWER LIMITED

West bengal

 

Overhauling of 36 TPH WHRB & 25TPH FBC  Cethar Vessels Boiler.

51

MAITHAN STEEL AND POWER  LTD.

West Bengal

33 MW

Overhaul & Maintenance for R&M of 1 x 33 MW   Thermal power plant  . 

52

MAAN STEEL AND POWER LTD.

West Bengal

15 MW

Overhaul & Maintenance for R&M of 1 x 15 MW   Thermal power plant  Operation and Maintenance

53

ANKIT METAL & POWER LIMITED

West bengal

UTILITY PLANT

Overhauling of 36 TPH WHRB & 25TPH FBC  Cethar Vessels Boiler.

54

VISION SPONGE & IRON LTD.

West Bengal

15 MW

Entire Operation & Maintenance of 15 MW Power Plant.

55

PINAX PAPER MILL PVT LTD.

West Bengal

3.5MW

Overhaul & Maintenance for R&M of 1 x 3.5 MW   Thermal power plant

56

 HIMADRI SPELAITY CHEM. LTD.

West Bengal

UTILITY PLANT

Operation and Maintenance

DOMESTIC BOILER ERECTION /COMMISSIONING/OVERHAULING

S.No

CLIENT

LOCATION

PLANT  CAPACITY

SCOPE OF WORK

1

CONCAST BENGAL

West bengal

 

CHP erection.

2

DAYA SUGAR PVT LTD.

Uttar Pradesh

 

Supplied 22 TPH water tube Bagasse fired Boiler & Commissioned it.

3

HIMADRI CHEMICALS

Singur

 

Operation And Maintenance of 7 boilers installed in Process shop.

4

KAMARHATI POWER PLANT

Burdwan

 

Shutdown maintenance of 30TPH Vision Boiler overhauling including ESP.

5

KSPL POWER PLANT

Jamshedpur

 

Overhauling of 41 TPH FBC & 10 X 4TPH WHRB Thermax Boilers.

6

MUKTESHWAR SUGAR.

Maharashtra

 

Supplied 3.0 MW Back Pressure Steam Turbine with supervision of Erection & Commissioning.

7

REWA KRIPA SUGAR MILL.

Madhya Pradesh

 

Supplied 2000 KW Back Pressure Steam Turbine for this plant and commissioned it.

8

SSPL/Cetharvessels

Raigarh

 

Erection & Commissioning of 50 TPH  Boiler .

9

SUPERSMELTERS

Jamuria

 

ESP Erection , Fabrication and compressor installation.

10

SWAIKA OIL MILL

Liluah,West Bengal

 

Erection & Commissioning of 4TPH FBC  Boiler .

11

THERMAX INDIA LIMITED

Belgharia

 

Erection of 6 TPH FBC Thermax Boiler at Vegetable Product, Belgharia Plant

12

TRANSTEC GREEN POWER PVT LTD.

Sanchore (raj.)

 

Generation & operation  maintenance of the 12 MW Power Plant with uninterrupted Fuel  supply .

DOMESTIC HYDRO

S.No

CLIENT

LOCATION

PLANT  CAPACITY

SCOPE OF WORK

1

TAMIL NADU ELECTRICITY BOARD

Tamil Nadu

70 MW

Overhaul & Maintenance for R&M of 2 x 35 MW Periyar Hydro VA Tech Hydro Ltd.

2

GOVERNMENT OF ASSAM

Karbi Langpi

50 MW

Erection, testing & commissioning of 50 MW Hydro TG Sets

3

NEORA HYDRO-ELECTRIC PROJECTS LTD.

 

3 MW

Overhauling & O&M of TG (3 X 1MW) sets under ALSTOM ltd.

4

GOVERNMENT OF ARUNACHAL PRADESH

Arunachal Pradesh

600 KW

R&M of Charju MHS (3X200KW)

5

GOVERNMENT OF ARUNACHAL PRADESH

Arunachal Pradesh

300 KW

R&M of Tissue MHS (3X100KW)

6

GOVERNMENT OF ARUNACHAL PRADESH

Arunachal Pradesh

150 KW

R&M of Thiatju MHS (3X50KW)

At Steller Energy and Constructions, we are dedicated to empowering power plants to achieve peak performance, enhance operational efficiency, and ensure long-term success. 

Offices

Registered Office: FF-4, Sushantlok -1 Sushant Vyapar Kendra,Gurgaon, HR-122009

Corporate Office: Works: Mustakil No. 25/10, 26/6/1, 7/1/1, Deoli Mandkaul Road, Baghola, Palwal, HR-121102

Contacts

+91 9289825952
nc@stellerenergy.in